How long does it take to repaint a flat?

Resources · 4 min read

Repainting a flat takes longer than you'd think — because the painting itself is only part of the work. Here are realistic ballpark figures.

The stages that take time

A painting job means: protecting the premises, preparing the surfaces (filling, sanding), a priming coat where needed, then two finishing coats with drying time between each. Preparation often accounts for half the time.

Indicative timings

  • One room (walls + ceiling): 1 to 2 days
  • A studio / 2-room flat: 2 to 3 days
  • A 3.5 to 4.5-room flat: 3 to 6 days
  • A house: 1 to 3 weeks depending on the surface area

These timings vary with the state of the walls: sound surfaces go quickly, whereas cracked, damp or old wallpapered walls call for far more preparation.

Can you live there during the work?

Often yes, by working room by room. For a full renovation, an empty home is still ideal and speeds the job up.

How to save time

  • Clear the rooms and dismantle whatever can be removed
  • Flag any repairs to be expected in advance
  • Group the works (painting + floors) into a single job

A painting project in Geneva?

Estimate your work online or request a free, no-obligation quote.

Frequently asked questions

How long is the drying time?

Allow a few hours between two coats and about 24 hours before putting surfaces to use. We plan the job around these timings.

Can you step in at short notice?

Depending on availability and urgency (end-of-lease in particular), we adapt to meet your deadlines.

Let's talk about your project today.